Your position:Home > News

Preparations for fire brick making machine that could not be ignored

2014-02-20

Brick is one of the widely praised by all fire brick making machine in recent years, buying equipment is also increasing. However, in order to make the device it should have value, there are a lot of considerations, here we come give you a Bona deserves our attention to operational considerations. In fact, block brick machine in the production is a lot of work to do before. These may seem simple, but has a deep impact. First is the regulation of electricity.
Different devices require the circuit size is different, so make sure you prior to adjusting the transformer, second in line to the device when connected, must be qualified, because some of the equipment require strong lines, and some devices require a weak line, which is very well adjusted.
After lines are adjusted, and also note that at the time of production, combined with various key jobs, power supply configuration, adjustment to the electronic control cabinets. When this is done, be sure to let the entire hydraulic brick making machine empty machine running 1-20 minutes, and see if a place is not in place, and then try the job, take a look at all aspects of cooperation in various sectors, if you can guarantee the normal operation and then jobs.

SKYPE: kevinlee02
QQ: 81573401
Tel: 0086-371-87091886
Fax:0086-371-87091887
E-mail:zzbona@zzbona.com

Name:
*
E-mail:
Message:

Copyright @ Bona enterprise. All rights reserved. Site Index Product Index

Design & Development by sinoart