Your position:Home > News

daily production and maintenance for brick machine

2021-08-27

 Brick machine daily production and maintenance need to pay attention to four points, and to guide the follow-up production has a great use, the brick of the specific operational matters are as follows;

 
1, The first is the establishment of specialized maintenance personnel, from time to time on the equipment inspection and maintenance, to develop suitable for the enterprise equipment maintenance and repair system. Everything is dry, to ensure that the equipment is running properly;
 
2, Followed by the production of maintenance, pay attention to observe the cement Mianshaozhuanji operating current is not normal, the motor temperature does not exceed 60 ℃, counterattack breaking large bearing temperature does not exceed 75 ℃, motor slip ring flash can not be too large; Failure should first start the second rotor, until the current stability and then launch a rotor;
 
3, When the production in the production of overcurrent or other reasons lead to jump when the switch speed down, sound tone, to stop the board to feed the machine in time to stop the supply of materials to avoid low-speed damage to the mechanical parts, which is the test site operators and Whether the daily maintenance work is proficient in operation.
 
4, In dealing with, counterattack after breaking the observation of no-load current is not stable body is not oscillation, oscillation should be promptly shut down to identify the reasons, the appropriate quickly feet screw to eliminate the oscillation phenomenon.

SKYPE: kevinlee02
QQ: 81573401
Tel: 0086-371-87091886
Fax:0086-371-87091887
E-mail:zzbona@zzbona.com

Name:
*
E-mail:
Message:

Copyright @ Bona enterprise. All rights reserved. Site Index Product Index

Design & Development by sinoart